4 Replies Latest reply on Nov 8, 2012 2:03 AM by simonp

    Migrate workstations from ePO4.6 to a new ePO4.6

      Hi All

       

      Currenly we have a buggy ePO 4.6 install running on Windows Server 2008 R2, we have over 90,000 workstations pointing to this ePO server, we want to replace this server as the server is no longer reliable

      We have built ePO4.6 onto two virtual machines running Windows Server 2008 R2 server on ESXi, we have choosen two virtual machines so that we can spilt the workstation load due to diffrence in enviromental conditions.

       

       

      1. What would be the best way to migrate workstation to talk to the new ePO silently from the old without any service disruptions?

      2. How can we backtrack what policies are assigned to what tags?

       

      Thanks,

      Nandini