2 Replies Latest reply on Oct 24, 2011 8:43 AM by KimNNH

    VSE 8.8 and ePO 4.6 - scheduled task stops after 20 minutes

      I have 2 scan tasks set on ePO 4.6. The machines are XP with VSE 8.8

       

      1. a full scan on all machines - that one runs fine and takes however long is necessary - sometimes 2 -3 hours.

      2. a targeted scan that I run as needed - that one stops after 20 minutes with the follow message on ePO "Run now task OnDemand Scan - as needed - is stopped by the scheduler".  If the scan happens to take less then 20 minutes it completes properly. 

       

      I have looked through both and cannot see where I set anything to 20 minutes. In fact, the targeted scan was built off a duplicate of the full scan.

       

      ???

       

      thank you