cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
Highlighted

Keeping VSE 8.8 Patch 7 and Patch 8 on repository

Hi guys,

I´m facing now the situation where I need to keep both versions.

Here on my environment we have on specific areas Windows XP and 2003, but Patch 7 was the lastest release to Support those environments and now we have Patch 8.

I know I could use Previous respository to keep Patch 7 while I´m using Patch 8 on Current, but, I´m thinking forward, if a Patch 9 be released I will have problems (I like to keep Previous version on previous repositor lol).

I know I´m able to keep 2 Major version on the repositor (8.8 and 8.7 for instance), but I dont how to keep 2 items from same Major Version just handling their minor versions.

I wish to create something like that on my master repositor.

VSE - Legacy 8.8 Patch 7

- Previous

- Current

- Evaluation

VSE - New Release 8.8 Patch 8

- Previous

- Current

- Evaluation

Is that possible?

Best Regards.

3 Replies
Highlighted

Re: Keeping VSE 8.8 Patch 7 and Patch 8 on repository

There are two types of VSE packages (not counting hotfixes).

Full installs

Patches

You can check in Full installs to the Eval, Current, and Previous branches

You can do the same with the patches

Previous, Eval, and Current are just labels. You can check in a lower revision patch to the Eval branch, or the current branch, or the previous branch,  So you can check Patch 9 in to Previous, Patch 8 into Current, and Patch 7 into Eval. It doesn't really matter as long as you match your Agent Repository settings as well.

Highlighted

Re: Keeping VSE 8.8 Patch 7 and Patch 8 on repository

Hi Slate,

I think maybe I was not totally clear, I know I can use those branches in any way, but they are designed for that specific reason (and I wish to keep in that way), otherwise that means I need to change the way our entire team uses it, specially because I´m not the only one to handle with ePO and VSE, I can´t take any chances of our Support staff being mislead because I changed something.

I want to create a legacy VSE entry on Repository just to have better control between product versions, in the same way you can with older major versions, but I dont know if it is possible

Highlighted

Re: Keeping VSE 8.8 Patch 7 and Patch 8 on repository

As far as I know, you only have the 3 branches. Previous, Current, Eval.

You can use them any way you wish, but that's the limit.

Full package deployments for Previous, Current, Eval do not need to match the patch branch. So you can have Full deployment package VSE 8.8 patch 8 in the Eval branch, and you can have VSE patch 8 (upgrade patch only) in the Current branch.

But if you're looking to make a 4th branch for the repository, I don't think that's possible.

You Deserve an Award
Don't forget, when your helpful posts earn a kudos or get accepted as a solution you can unlock perks and badges. Those aren't the only badges, either. How many can you collect? Click here to learn more.

Community Help Hub

    New to the forums or need help finding your way around the forums? There's a whole hub of community resources to help you.

  • Find Forum FAQs
  • Learn How to Earn Badges
  • Ask for Help
Go to Community Help

Join the Community

    Thousands of customers use the McAfee Community for peer-to-peer and expert product support. Enjoy these benefits with a free membership:

  • Get helpful solutions from McAfee experts.
  • Stay connected to product conversations that matter to you.
  • Participate in product groups led by McAfee employees.
Join the Community
Join the Community