Upgrading VSE 8.5i to VSE8.7i

Dear all

For some this might look peanuts to you, but it's new for me.

I want to upgrade our 8.51 environment to 8.7i. Also the EPO 4.0 to EPO 4.5, and agent 3.6 to 4.0.
I know you can do this via package update. However when this will be done, it will start upgrading all repositories and agents. This will dramatically slow down the lines to our branchoffices. Is there a way to do this separately???? Branchoffice per Branchoffice??

any suggestions/help are welcome.

(i'm not fully known with McAfee products.)

thanks in advance

Moved from home products to the appropriate area - Moderator
5 Replies
pibo
Level 7
Report Inappropriate Content
Message 2 of 6

RE: Upgrading VSE 8.5i to VSE8.7i

anybody :confused:
robpow
Level 10
Report Inappropriate Content
Message 3 of 6

RE: Upgrading VSE 8.5i to VSE8.7i

If your ePO directory is organised by branch location you could run the task for one branch at a time. Or push out the agent and VSE updates manually using SMS, Altiris or whatever you're using.

Or am I missing some essential point of your question?

Matt
Travler
Level 10
Report Inappropriate Content
Message 4 of 6

RE: Upgrading VSE 8.5i to VSE8.7i

I'm in the middle of just such upgrades right now, with the exception of moving from ePO 3.6.1 to 4.5. I would not try to update all 3 at the same time; divide them into 3 distinct projects. I'm doing the 8.7 upgrade first, which I will follow with the Agent, then finally the ePO server.

Our ePO directory is set up by office departments so I can push the upgrades to just one department at a time, reducing the effect that such traffic would have on our network performance. This also allows me to send out upgrades to lower priority departments as a final means of testing. Once I'm assured that the package is going out and installing normally, then I can schedule the updates to departments when they are least busy (for instance, at night for the departments that are not open 24/7).
pibo
Level 7
Report Inappropriate Content
Message 5 of 6

RE: Upgrading VSE 8.5i to VSE8.7i

thanks for the reply!

i'm going to upgrade one step at the time.
starting with VSE first, let it run for a week, and then the rest.

Will see what happens, in worst case scenario i have to start over.

I'm investigating the current situation, and make a plan, how to ....

i'll keep my fingers crossed.

Thanks so far.
PhilR
Level 12
Report Inappropriate Content
Message 6 of 6

RE: Upgrading VSE 8.5i to VSE8.7i

I'd do the upgrade in a different order.

MA 4.0P3 first (don't forget to check the agent extension into ePO extensions as well)

Make sure engine 5400 is checked into ePO and deploying.

Then 8.7i with Patch 2.

Only then upgrade / sidegrade / downgrade to ePO 4.5.

Personally, I'd hold back from 4.5 until after ePO 4.5 Patch 1 is relesed.

Phil
More McAfee Tools to Help You
  • Subscription Service Notification (SNS)
  • How-to: Endpoint Removal Tool
  • Support: Endpoint Security
  • eSupport: Policy Orchestrator
  • Community Help Hub

      New to the forums or need help finding your way around the forums? There's a whole hub of community resources to help you.

    • Find Forum FAQs
    • Learn How to Earn Badges
    • Ask for Help
    Go to Community Help

    Join the Community

      Thousands of customers use the McAfee Community for peer-to-peer and expert product support. Enjoy these benefits with a free membership:

    • Get helpful solutions from McAfee experts.
    • Stay connected to product conversations that matter to you.
    • Participate in product groups led by McAfee employees.
    Join the Community
    Join the Community